Velocity fluctuation

Velocity is a metric representing the amount of Product Backlog effort turned into a releasable Increment of product during an Iteration (i.e. Sprint) by an Agile Team Team (i.e. Scrum Team). Velocity average should tend to a constant number with the pass of the iterations but some deviations may be accepted. When establishing upper and lower limits you can detect when an Agile Team is “fluctuating” more than what it is desired.



  • Download this Chart

    • Hints!

    • Upper fluctuation limit
      The maximum variance percentage accepted above the average velocity. 20% could be a reasonable number to start by.
    • Lower fluctuation limit
      The maximum variance percentage accepted below the average velocity. 10% could be a reasonable number to start by.
    • Iteration's completed effort
      Provide the effort completed in your previous iterations (i.e. Sprints) to calculate the average velocity.
    • Now go and try it!

    Create your chart

    Upper fluctuation limit is required. Min value is 1 / Max value is 100.
    Lower fluctuation limit is required. Min value is 1 / Max value is 100.
    Required. Min value is 1 / Max value is 10000000.